Difference between revisions of "Wet Cement"
Jump to navigation
Jump to search
m |
|||
Line 6: | Line 6: | ||
== Details == | == Details == | ||
Wet Cement is a wet version of a [[Dry Cement|Dry Cement]]. Walking on Wet Cement will make you slow. If you place a Wet Cement, it will dry off in 8 hours so you will not be able to place another block above it until it is dried up. | Wet Cement is a wet version of a [[Dry Cement|Dry Cement]]. Walking on Wet Cement will make you slow. If you place a Wet Cement, it will dry off in 8 hours so you will not be able to place another block above it until it is dried up. | ||
− | The texture of a | + | The texture of a Wet Cement and [[Dry Cement|Dry Cement]] are different. |
<br> | <br> | ||
Revision as of 09:15, 9 July 2016
Wet Cement is a WET block and is almost the same as Dry Cement. It is a craftable block.
Details
Wet Cement is a wet version of a Dry Cement. Walking on Wet Cement will make you slow. If you place a Wet Cement, it will dry off in 8 hours so you will not be able to place another block above it until it is dried up.
The texture of a Wet Cement and Dry Cement are different.
Notes
- Wet Cement takes 8 hours to dry off.
- If a Wet Cement has been placed for 8 hours, it will turn into a Dry Cement
Recipe
Icon: |
Item name: |
Recipe: | ||||||||||||||||||
|
Wet Cement |
| ||||||||||||||||||